(1) Where a network operator damages a utility installation in the process of carrying out road works, the operator shall immediately notify the utility installation owner and repair the damage to the utility installation within two weeks and the costs arising from the repairs shall be borne by the network operator;

(2) A network operator shall, complete road works and restore the road and public grounds, including the removal of debris, to the satisfaction of the relevant authority as quickly as possible and within two weeks after completion of the road works.

(3) A network operator which fails to comply with subsection (2) is liable for the expenditure incurred in the restoration of the road and public grounds and for any other loss caused to another person.