(1) An applicant for authorization to conduct mining or to process material that involves uranium or thorium ore from a site shall, provide information to the Authority on the following:
(a) the mining lease;
(b) the site characteristics, including geology and mineralogy;
(c) the siting or construction plans;
(d) the conceptual design of the mining or processing facility;
(e) proposed work activities, extraction techniques and types of equipment involved;
(f) quantities of uranium or thorium to be removed with the ore;
(g) transportation of the ore;
(h) estimates of exposures and doses for workers;
(i) the measures to be taken for radiation protection;
(j) the procedures for accident prevention;
(k) the plans for effluent management systems and procedures;
(l) procedures for dealing with accidental releases of radioactive
or non-radioactive contaminants to the environment, including mitigation of hazards;
(m) impacts on public health and safety and the environment;
(n) the siting of tailings and storage facilities or stockpiles of ore and waste rock;
(o) the proposed decommissioning plans, including financial arrangements for decommissioning; and
(p) security measures.