The Utility shall be responsible to
(a) grant arid control connections to the transmission system in order to facilitate open, fair and non-discriminatory access to the transmission assets by other grid participants;
(b) co-ordinate the design, installation and maintenance of the transmission equipment to meet system performance and reliability requirements;
(c) co-ordinate the design, installation and maintenance of the protection system to ensure timely disconnection of faulty facilities and equipment; and
(d) Co-ordinate the implementation of the system expansion plans developed by the Utility.