(1) The construction and installation of facilities for the provision of a broadcast service shall commence within 2 years from the date of the grant of the frequency authorization and the operator shall carry out testing for its operations within the specified period.

(2) The Authority shall cause an inspection of the construction of the proposed broadcast facility and may make technical recommendations which shall be complied with by the operator.

(3) The Authority may conduct a second inspection during the construction and installation period. ·

(4) When a second inspection is conducted, the Authority may issue a certificate that the construction and the installation comply with the standard set by the Authority or shall upon written notice of not less than 30 clays from the date of the second inspection to the operator, cancel the frequency authorization if the operator is unable to meet the construction and installation standards.