Print Options

(1) A supplier shall achieve the voltage levels specified in regulation 8 (1) within the period specified in the Electricity Supply (Technical and Operational) Rules, 2005 (LI 1816). 

(2) The payment of the sums prescribed in the Schedule shall be due two years after commencement of these Regulations.