Print Options

(1) Periodic inspection and tests shall be conducted by the utility to determine if the installed corrosion control methods used are adequate and effectively protect the pipe line.

(2) Whenever a portion or section of an underground facility is uncovered, an inspection shall be made to determine if protection is needed or if installed protection is adequate at that point.